Co-funded by the European Union · Italian Republic · Campania Region · PR Campania FESR 2021-2027

Co-funded project

Energy efficiency upgrade of our plant

At its Avellino plant, Intertec Srl has carried out an integrated energy efficiency and energy saving programme covering production equipment, climate control, lighting and the building envelope, combined with a photovoltaic system for self-consumption. The project is co-funded by the European Union and the Campania Region under the Campania Regional Programme ERDF 2021-2027 (PR Campania FESR 2021-2027).

Objectives

Lower consumption, lower emissions, more clean energy

The project aims to achieve a lasting reduction in the plant's energy consumption and greenhouse gas emissions — across more than 16,000 m² of production areas and about 2,000 m² of offices — by replacing outdated systems with high-efficiency technologies, phasing out natural gas for heating and covering a significant share of electricity demand with renewable energy generated on site.

Project details

Programme
PR Campania FESR 2021-2027 (ERDF)
Priority and Action
Priority 2 "Energy, environment and sustainability" — Action 2.1.1
Call for proposals
Support for Campania-based companies in promoting energy efficiency and energy saving (Regional Council Resolutions no. 451 and 664/2022 — Executive Decree no. 54 of 27/01/2023)
Beneficiary
Intertec Srl
Project site
Via Pianodardine, Avellino (Italy)
CUP (project code)
B39C23000180007
Grant awarded
€ 625,450.72

Completed interventions

What we did

Line A — Efficiency of production systems and buildings

Power factor correction

Installation of a 600 kVAr automatic power factor correction system that raises the plant's power factor from about 0.71 to 0.95, reducing reactive energy drawn from the grid, line losses and the related penalties.

High-efficiency compressors

Replacement of the 55 kW fixed-speed air compressors with new-generation variable-speed models with inverter drives, which match power draw to the actual compressed-air demand.

Office building envelope insulation

New waterproofed and insulated warm roof and a new insulated ventilated façade on the office building: the thermal transmittance of these surfaces drops from about 1.9 to less than 0.2 W/m²K.

New climate control system

Decommissioning of the old natural gas boiler and installation of a VRF system with two high-efficiency heat pumps for the offices, complemented by infrared heaters that provide targeted heating to workstations in the production areas.

Building automation

Automatic control of indoor lighting and climate via timers and daylight, presence and motion sensors, so that systems and lights run only when and where they are needed.

LED relamping

Replacement of conventional lamps — indoor fluorescent tubes and outdoor vapour lamps — with low-consumption, long-life Smart LED luminaires.

Line B — Renewable energy generation

500 kWp photovoltaic system

Rooftop photovoltaic system with high-efficiency monocrystalline modules, without storage, whose output is entirely used for the plant's self-consumption: an estimated generation of about 600,000 kWh per year.

Expected results

The impact of the interventions

~460 t
of CO₂ avoided every year
~126,000 Sm³
of natural gas saved every year
~600 MWh
of solar energy self-generated every year
0.95
power factor after correction (from 0.71)

Figures estimated in the project energy audit, based on actual consumption data. The results actually achieved will be published on this page at the end of the monitoring period.

Local impact

Benefits beyond the company

Lower emissions in the Pianodardine industrial area: phasing out the natural gas boiler and generating solar power reduce CO₂ emissions and combustion-related local pollutants.

Better working conditions for the people who work at the plant every day, thanks to efficient climate control, targeted workstation heating and high-quality LED lighting.

A more competitive and sustainable manufacturing sector in Campania: lower energy costs strengthen Intertec's 100% Italian production and local employment, contributing to the EU's energy transition goals.

Project co-funded by the European Union — European Regional Development Fund (ERDF) — and by the Campania Region under the PR Campania FESR 2021-2027.